Tuesday, December 31, 2013

Hibernation

It was a warmish day in November so I cleaned out the garage which was a mess with all the plastering and fiberglassing going on 
 I washed the bikes, ran some stabilizer through them with a quick ride each and put them to bed for the winter
Depressing...



Tuesday, December 17, 2013

I cleaned up the tail and tried it back on the frame in the basement


Four layers of fiberglass cloth
It lays down much nicer than mat



Spray glue and tinfoil and then sneak the tinfoil back into the kitchen before anyone notices


The license plate bracket is at the right angle and the cut outs down to the frame have been plastered


 More plastering


Sunday, December 15, 2013

Building the Seat

I started building the seat by making a framework


Niagara Falls

We made a nice run down to Niagara Falls

Steve, Jimmy, Gary, Sean and Kirk were along




Friday the 13th September 2013

Another Friday the 13th with stops at Steve's in Brantford and the Boston Baptist Church to see Pastor Peter Lamont again
The blue 1200 is his
The regulars: Steve, Jimmy, Ricker, Gary, Sean and myself were there
There was a huge turnout despite the cold temps








I have everything taped off and covered up in preparation for forming the seat portion of the plug
No matter how carefully everything is covered up there will still be plaster everywhere


Building the Tail in the Garage

I finally started working on the tail in the garage where I can fiberglass it
If I fiberglass in the house I will be divorced